Tenderwize
Back to tender search

Design and Construction of S19 Expressway Section 2

Generalna Dyrekcja Dróg Krajowych i Autostrad·Lublin, Poland·Deadline Sep 15, 2026 · 29 days left·Open·Works
Original notice title

Poland – Construction, foundation and surface works for highways, roads – Projekt i budowa drogi ekspresowej S19 na odcinku granica woj. podlaskiego – Łosice – granica woj. lubelskiego, odc. realizacyjny nr 2: węzeł „Łosice” (z węzłem) – granica woj. lubelskiego

61/100

Opportunity Score

Needs reviewHigh complexity
WorksOpen
Why this score?

Opportunity

61 / 100

Complexity

86 / 100

Risk factors

Submission must be electronic through the indicated platform; failure to use the correct channel may invalidate the ten...

The turnover, liquidity, experience, and personnel thresholds are substantial and may exclude many bidders.

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Works contract
  • 1 lot
  • Duration 47 MONTH
  • Design and construction of a dual carriageway expressway section S19.
  • Construction of junctions and related road infrastructure.
Show full summary

Open Polish works contract for design and construction of expressway S19 section from Łosice junction to the Lublin voivodeship border. Single lot, electronic submission required via the GDDKiA platform. The notice indicates a very large estimated value (above EUR 20 million), but no exact contract value is provided in the structured data or XML. Key participation conditions include high turnover, liquidity, prior road/bridge experience, a qualified site manager, a 5,000,000 PLN bid bond, and mandatory in-house performance of the main pavement works.

Risks

Submission must be electronic through the indicated platform; failure to use the correct channel may invalidate the ten...

The turnover, liquidity, experience, and personnel thresholds are substantial and may exclude many bidders.

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Bid bond of 5,000,000 PLN is required.

Administrative

  • Electronic submission is required.
  • Communication takes place via the platform at Open portal

Award Criteria

Lot 1

Price, 60% (per-exa)60%

Buyer

Location

Lublin, POL

Identifier

8971770779

Activity

General public services

Lots (1)

LOT-0001

Design and Construction of S19 Expressway Section 2

Design and build of a dual carriageway expressway S19 in Mazowieckie region (Łosice county; Łosice, Olszanka and Huszlew communes), including roadworks, junctions, road relocations, supporting roads, engineering structures, ground improvement, drainage, fencing, traffic safety equipment, environmental protection measures, and utility relocations. The contracting authority reserves personal execution of the main carriageway pavement works and related pavement layers above native soil/fill, excluding materials and services.

WorksEU fundedElectronic submission

Location

PL814, Poland

Duration

47 MONTH

Category

Construction

Award Criteria

Price

Deadline

Deadline Sep 15, 2026

Procurement Details

Publication date
07 Jul 2026
Languages
Polish

Reference metadata

Legal basis
32014L0024

Reference IDs

Tender ID
468540-2026

Documents (1)

Similar tenders