Tenderwize
Back to tender search

Default lot

METROREX S.A.·Bucuresti, Romania·RON 101.6M | EUR 19.4M·Deadline Aug 17, 2026 · 1 day left·Open·Works
High value
Original notice title

Romania – Underground railway works – Proiectare și execuție lucrări pentru realizarea obiectivului de investiții „INTEGRAREA SISTEMULUI DE CONTROL ACCES AL MAGISTRALEI 4 (RACORD 1 – NICOLAE GRIGORESCU 2 – ANGHEL SALIGNY ȘI RACORD 2 – GARA DE NORD 2 – STRĂULEȘTI) CU MAGISTRALELE 1, 2 ȘI 3 ȘI TL”

66/100

Opportunity Score

Needs reviewHigh complexity
WorksOpen
Why this score?

Opportunity

66 / 100

Complexity

78 / 100

Risk factors

The notice points to procurement documents, but no extracted procurement document text was provided, so detailed techni...

Clarifications must be submitted exclusively in Romanian via SEAP, which may create compliance risk for non-Romanian te...

Submission deadline in 1 days

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • RON 101.6M estimated value
  • Works contract
  • 1 lot
  • Duration 7 MONTH
  • Design and execution of works for integration of Metrorex M4 access control with lines 1, 2, 3 and TL.
  • Technical design, detailed design, and integration technology plans.
Show full summary

Open works contract for design and execution to integrate Metrorex’s M4 access control system with metro lines 1, 2, 3 and TL in Romania. The notice indicates a single lot, EU-funded, with electronic submission required via SEAP/e-licitatie. Estimated contract value is RON 101,583,462.3. The extracted TED XML confirms the notice and adds that award criteria include price and quality, but the structured data only provides the price criterion weight; the full document set was not provided, so document-based requirements could not be analyzed.

Risks

The notice points to procurement documents, but no extracted procurement document text was provided, so detailed techni...

Clarifications must be submitted exclusively in Romanian via SEAP, which may create compliance risk for non-Romanian te...

Submission deadline in 1 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Clarification requests are accepted only up to 20 days before the bid deadline.

Administrative

  • Electronic submission is required.
  • Clarifications must be submitted exclusively in SEAP and in Romanian.

Award Criteria

Lot 1

Price criterion, weight 30, scored proportionally (per-exa).30%

Buyer

Location

Bucuresti, ROU

Buyer profile

Open profile

Identifier

RO 13863739

Activity

Urban railway, tramway, trolleybus or bus services

Lots (1)

LOT-0000

Default lot

Design and execution works for integrating the M4 access control system (Racord 1 Nicolae Grigorescu 2–Anghel Saligny and Racord 2 Gara de Nord 2–Străulești) with metro lines 1, 2, 3 and TL. Scope includes technical design, permits/approvals documentation if needed, risk analysis for physical security, supply/transport/installation of hardware, auxiliary systems (including CCTV, anti-intrusion, sound, telephony, ventilation, power, grounding, fire detection/signalling as applicable), software supply/configuration, IT integration with Metrorex systems, testing, commissioning, and staff training. Performance location is Romania, region RO321. Source: structured data.

WorksEU fundedElectronic submission

EUR 19.4M

Estimated value

Location

RO321, Romania

Duration

7 MONTH

Category

Underground railway works

Award Criteria

Price

Deadline

Deadline Aug 17, 2026

Procurement Details

Publication date
29 Jun 2026
Languages
Romanian

Reference metadata

Legal basis
32014L0025

Reference IDs

Tender ID
445776-2026

Documents (2)

Similar tenders