Overhead line construction
Original notice title
Austria-Innsbruck: Overhead line construction
Opportunity Score
Why this score?
Opportunity
52 / 100
Complexity
78 / 100
Risk factors
The structured data shows a submission deadline of 2035-12-31 09:00 UTC, while the XML notice shows 2035-12-31 10:00. T...
Participation requirements are said to be defined in the qualification system rules / criteria, but those rules are not...
No procurement documents available
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- Establishment of new 110 kV and 220 kV overhead line mast structures, including steel lattice masts and steel monopole/wall-type masts.
- Earthworks and foundation construction for masts, including isolated foundations or block foundations with small-bore/micropiles or driven piles.
Show full summary
This is a works contract notice for a qualification system / prior qualification scheme for overhead line construction in Tirol, Austria. The main scope covers construction of new 110 kV and 220 kV overhead line support structures, earthworks and foundations, grounding, and fitting/rope works for conductor systems and OPGW earth wire. The notice indicates that selected prequalified bidders will be invited to specific future tenders under the system. No contract value is provided in the structured data or XML notice.
Risks
The structured data shows a submission deadline of 2035-12-31 09:00 UTC, while the XML notice shows 2035-12-31 10:00. T...
Participation requirements are said to be defined in the qualification system rules / criteria, but those rules are not...
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- The notice refers to participation in a qualification system / prior qualification scheme for overhead line construction.
- Requirements for participation and prequalification are defined in the system rules / criteria, but those rules are not included in the provided text.
Administrative
- The XML notice states that offers are submitted for all lots, but no lot structure is shown in the structured data.
Buyer
Location
Innsbruck, AUT
Website
Activity
Electricity-related activities
Procurement Details
- Publication date
- 16 Sep 2019
- Languages
- German
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 437189-2019
Similar tenders
France – Insurance services – Prestations de services d'assurance pour groupement le groupement hospitalier de territoire Yvelines Nord
Finland – Architectural, construction, engineering and inspection services – Tietomallikoordinaattori-, inventointimittaus- ja mallinnuspalvelujen puitejärjestely 2026-2028 (2028-2030)
Spain – Building-cleaning services – Servicios de limpieza en Centros de Sevilla, Murcia y Galicia, de la Agencia Estatal Consejo Superior de Investigaciones Científicas.
Romania – Street-cleaning and sweeping services – Acord cadru de prestare a serviciilor de delegare a activităților de măturat, spălat, stropit si întreținerea căilor publice și activități de curățare și transport al zăpezii de pe căile publice și menținerea în funcțiune a acestora pe timp de polei sau îngheț, pe timp de iarnă din cadrul serviciului de salubrizare a orașului Negrești Oaș
France – Insurance services – MARCHE DE SERVICES EN ASSURANCE
Spain – Architectural, construction, engineering and inspection services – Redacción del Proyecto Básico y de Ejecución, Redacción del Estudio de Seguridad y Salud y Dirección de Obra para la construcción del I.E.S. Nº 1 de 12+0 uds. (Fase 1) en la urbanización El Bosque de Pioz (Guadalajara).
Opportunity Score
Why this score?
Opportunity
52 / 100
Complexity
78 / 100
Risk factors
The structured data shows a submission deadline of 2035-12-31 09:00 UTC, while the XML notice shows 2035-12-31 10:00. T...
Participation requirements are said to be defined in the qualification system rules / criteria, but those rules are not...
No procurement documents available
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications