Framework agreement contracts - Welding and muffing district heating
Original notice title
Norway – District-heating mains construction work – Framework agreement contracts - Welding and muffing district heating
Opportunity Score
Why this score?
Opportunity
55 / 100
Complexity
65 / 100
Risk factors
Working in urban ditches with existing infrastructure (cables, pipes) can cause unpredictable delays and planning chall...
Welding and muffing specifications not fully detailed; may require specific certifications or approvals.
Submission deadline in 3 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- NOK 18M estimated value
- Framework procurement
- Works contract
- 1 lot
- Duration 48 MONTH
- Welding on district heating pipes up to DN250
- Muffing on district heating pipes up to Ø450 mm
Show full summary
Framework agreement for welding and muffing of district heating pipes in the Nord-Jæren region (Stavanger, Sandnes, Sola). The contracting authority needs extra capacity for welding on pipes up to DN250 and muffing up to Ø450 mm. Work is mainly in urban ditches, often near existing infrastructure. Tenderers must move between projects within a day. Personnel managed by the contracting authority's project manager. One lot, 48-month framework agreement, negotiated procedure with call for competition. Estimated total value 18,000,000 NOK, framework maximum amount 25,000,000 NOK. Award criteria: price 40%, quality 60%. EU-funded.
Risks
Working in urban ditches with existing infrastructure (cables, pipes) can cause unpredictable delays and planning chall...
Welding and muffing specifications not fully detailed; may require specific certifications or approvals.
Submission deadline in 3 days
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Framework agreement with call-off orders
- Duration 48 months, with possible extension of 1+1 years
- Negotiated procedure with call for competition
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Location
STAVANGER, NOR
Website
Buyer profile
Identifier
982929733
Activity
General public services
Lots (1)
LOT-0001
Framework agreement contracts - Welding and muffing district heating
Welding (DN250 and below) and muffing (Ø450 mm and below) of district heating pipes. Work on the contracting authority's projects/sites in Nord-Jæren. Contractor provides personnel for extra capacity; materials and drawings provided by the authority. Work mainly outdoors in urban ditches. Call-off based, with possible movement between sites within a day.
EUR 1.6M
Estimated value
Location
Duration
Category
Award Criteria
Deadline
Award details
Price
Quality
Additional CPV codes
Value note
Show original TED data
Original TED description
The procurement is for a framework agreement for contract work in the form of welding and muffing of district heating pipes (fv-pipes). As a part of district heating development, the contracting authority has, in periods, a need for extra capacity. Typical work assignments that are included in this contract (not exhaustively, other assignments can occur): · Welding on county road pipes in the dimensions up to and including DN250 · Muffing on county road pipes in dimensions up to and including Ø 450 mm. The work place will be on the Contracting Authority's projects/sites in Nord-Jæren. Most of the contracting authority ́s district heating installations are located in Stavanger, Sandnes and Sola municipalities. The work will mainly take place outside in ditches in urban areas. Project work connected to district heating will mainly be carried out by the Contracting Authority's own installers/welders. The Contracting Authority can, however, use the Supplier for welding and movable work on district heating pipes at periods with many assignments and high activity. When working in ditches that can contain a lot of existing infrastructure, it can often be challenging to plan progress in a structured and rational way. The tenderer must expect to move between different projects, i.e. building and construction sites, within the working day/work period that each Call-off applies to. There may also be instances where the tenderer must move within a project during the work day. The tenderer's personnel will be managed/led by the Contracting Authority's project manager and the Contracting Authority presents the necessary material and work basis/drawings.
Procurement Details
- Publication date
- 21 Jun 2026
- Languages
- English, Norwegian
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 428065-2026
Documents (1)
Similar tenders
France – Insurance services – Prestations de services d'assurance pour groupement le groupement hospitalier de territoire Yvelines Nord
Finland – Architectural, construction, engineering and inspection services – Tietomallikoordinaattori-, inventointimittaus- ja mallinnuspalvelujen puitejärjestely 2026-2028 (2028-2030)
Spain – Building-cleaning services – Servicios de limpieza en Centros de Sevilla, Murcia y Galicia, de la Agencia Estatal Consejo Superior de Investigaciones Científicas.
Romania – Street-cleaning and sweeping services – Acord cadru de prestare a serviciilor de delegare a activităților de măturat, spălat, stropit si întreținerea căilor publice și activități de curățare și transport al zăpezii de pe căile publice și menținerea în funcțiune a acestora pe timp de polei sau îngheț, pe timp de iarnă din cadrul serviciului de salubrizare a orașului Negrești Oaș
France – Insurance services – MARCHE DE SERVICES EN ASSURANCE
Spain – Architectural, construction, engineering and inspection services – Redacción del Proyecto Básico y de Ejecución, Redacción del Estudio de Seguridad y Salud y Dirección de Obra para la construcción del I.E.S. Nº 1 de 12+0 uds. (Fase 1) en la urbanización El Bosque de Pioz (Guadalajara).
Opportunity Score
Why this score?
Opportunity
55 / 100
Complexity
65 / 100
Risk factors
Working in urban ditches with existing infrastructure (cables, pipes) can cause unpredictable delays and planning chall...
Welding and muffing specifications not fully detailed; may require specific certifications or approvals.
Submission deadline in 3 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications